Typical Daily Inspection generated by See Click Fix (screen varies based on system)
-
Continuing to progress from the days of the Cuyahoga River under PL 80-845
-
Typical Progression of Subdivision from initial permit in 2006 with single lots in common development
-
Maintenance of Coir Baffle - Turbidity Curtain by Keystone Homes personnel
-
Keystone Homes personnel take advantage of reduced volume for maintenance
-
Re-establishing groundcover by Vannoy Construction - Ace Avant at old entrance
-
Establishing groundcover on new sediment basin installed by Ace Avant
-
Diversion swale directing construction site runoff to sediment basin
-
Mandatory perimeter boundary with external 8 foot separation to limit of disturbance
-
Various stages of groundcover stabilization on site by Ace Avant personnel
-
Various stages of groundcover stabilization on site monitored by Vannoy Construction personnel
-
Groundcover stabilization following installation of erosion measure offset from limits
-
Preparation of dewatering location at alternate outlet by Miller Grading
-
Samples from sediment basin with and without mandatory PAM treament
-
Preparation of sediment sideslopes by Miller Grading prior to compliance inspection
-
Installation of slope drain prior to compliance inspection for mass grading authorization
-
Use of mandatory rain guage on site with sediment basin elevation in background
-
Silt buddy configuration with wattle protection over weep hole
-
Construction of new construction entrance to site in preparation of compliance inspection
-
Coir Baffle - Turbity Curtain Configuration after 2-inch rain event in less than 12 hours constructed by Keystone
-
Current Version of Certificate of Approval for ACE Integrated Stormwater Management Program 5/31/23
-
AutoCad Drawing of Coir Baffle - Turbidity Curtain with Dewatering Stations
-
Construction of new construction entrance to site in preparation of compliance inspection
-
Citizen with Rain Gauge
-
Coir Baffle - Turbity Curtain Configuration after 2-inch rain event in less than 12 hours
-
Sediment Basin before installation of functioning surface skimmer
"Thanks for the rain gauge. It was a great teaching moment for my 5 year old son. We placed it in our raised garden yesterday and had a great conversation about rain, why we monitor the amount of rain, what might happen if we get 6 inches or more, etc. Always good to get him outside for a little bit, even if it is a little cold. Thanks again!” -Archdale Citizen