What is the purpose of the asset tabular table on phase construction drawings?

The asset table identifies all infrastructure installed on the phase and the cost of the installation of assets during construction which will be transferred over to the City of Archdale for future maintenance.

a.    What are the linear feet of road constructed in the phase to be transferred to the City of Archdale, and how much did it cost to construct identified by street?

b.    What are the linear feet of storm drainage infrastructure and sanitary sewer infrastructure constructed in the phase to be transferred to the City of Archdale, and how much did it cost to construct identified by pipe size and structure size?

c.    What are the linear feet of water distribution infrastructure constructed in the phase to be transferred to the City of Archdale, and how much did it cost to construct identified by pipe size?

d.    Information provided on the plans will be used for the formal request made to the City Council of Archdale to accept the infrastructure for maintenance.

Show All Answers

1. What does the acronym “ACE” stand for?
2. How is the ACE Integrated Stormwater Management Program involved potential development?
3. During the initial stages, the developer will acknowledge and submit basic information for use in creating the project file.
4. How are the digital files provided by the developer/engineer used?
5. Why is the name of the project so specific?
6. What are common errors in the preparation of the Financial Responsibility/Ownership Form?
7. What are common errors on the Stormwater Agreement?
8. When do I get a yellow copy of the Certificate of Approval?
9. How often should See Click Fix be used for the project?
10. What is required for the issuance of a Certificate of Occupancy provided by Randolph County?
11. What is the purpose of the asset tabular table on phase construction drawings?
12. How are the permit Operation & Maintenance Plan(s) of the ACE Integrated Stormwater Management Plan affected by mandated revisions from NC State & the Environmental Protection Agency initiatives?
13. How is the current edition of AutoCAD submissions used by the City of Archdale?
14. Does the City of Archdale have a proprietary set of drawings for castings?
15. What typically happens when an unsealed AutoCad digital record drawing and AutoCad hard copy record drawing is submitted?
16. How can a contractor remove an erosion control fence during construction?
17. How does the "effectiveness of measure" relate to "making an effort?"
18. How do contractors' typically address sediment transport internal to a project site?