When do I get a yellow copy of the Certificate of Approval?

a.    Certificate of Approvals’ will only be issued when a complete package is received by the City and all documents matches including a COC from the State of North Carolina.  A not-for- construction white copy of the certificate of approval will be issued to meet the requirements of the Notice of Intent application with the State of North Carolina.

b.    Part of the process prior to the issuance of a yellow copy of the Certificate of Approval is a review of the installed perimeter erosion control features. Initial verification of the number of erosion control features, design professional and city staff site visit confirming modifications made by the contractor during installation of measures due to in-situ conditions have been appropriately documented.

c.    During this on-site review, design professional, contractor, and city staff emphasize the difference between “making an effort by the contractor to protect the environmental impact of construction” and “demonstrating the effectiveness of the measures used by the contractor to protect the environmental impact of construction.”

Show All Answers

1. What does the acronym “ACE” stand for?
2. How is the ACE Integrated Stormwater Management Program involved potential development?
3. During the initial stages, the developer will acknowledge and submit basic information for use in creating the project file.
4. How are the digital files provided by the developer/engineer used?
5. Why is the name of the project so specific?
6. What are common errors in the preparation of the Financial Responsibility/Ownership Form?
7. What are common errors on the Stormwater Agreement?
8. When do I get a yellow copy of the Certificate of Approval?
9. How often should See Click Fix be used for the project?
10. What is required for the issuance of a Certificate of Occupancy provided by Randolph County?
11. What is the purpose of the asset tabular table on phase construction drawings?
12. How are the permit Operation & Maintenance Plan(s) of the ACE Integrated Stormwater Management Plan affected by mandated revisions from NC State & the Environmental Protection Agency initiatives?
13. How is the current edition of AutoCAD submissions used by the City of Archdale?
14. Does the City of Archdale have a proprietary set of drawings for castings?
15. What typically happens when an unsealed AutoCad digital record drawing and AutoCad hard copy record drawing is submitted?
16. How can a contractor remove an erosion control fence during construction?
17. How does the "effectiveness of measure" relate to "making an effort?"
18. How do contractors' typically address sediment transport internal to a project site?